Henry Angus Tower Seismic Upgrades

Project Snapshot

Project Sponsor: Provost & VP Academic
Project Size: No change to existing building area
Budget: $4.162 million
Occupancy: January 2017
Project Manager: UBC Project Services
Architect: Acton Ostry
Construction Manager: Heatherbrae

Project Summary

Structural upgrades to address very high seismic risk in a high use office tower occupied by the Sauder School of Business. This project was prioritized for upgrade as part of the UBC Seismic Mitigation Plan based on the impact evaluation and the relatively straightforward nature of the upgrade work required.